Please use this identifier to cite or link to this item:
https://hdl.handle.net/11681/34857
Title: | Calcasieu Lock Louisiana Feasibility Study with Integrated Environmental Impact Statement |
Authors: | United States. Army. Corps of Engineers. New Orleans District. |
Keywords: | Calcasieu Locks (La.) Inland navigation Waterways Environmental management |
Publisher: | United States. Army. Corps of Engineers. New Orleans District. |
Abstract: | The Calcasieu Study addresses navigation improvement planning for the Gulf Intracoastal Waterway at and in the vicinity of Calcasieu Lock, Calcasieu Parish, LA. This Study was developed from the results of the GIWW Locks, Louisiana reconnaissance report, completed in May 1992. The 1992 comprehensive Study involved a systems analysis of the GIWW locks west of the Mississippi River. The report documented the need for replacements or improvements at Bayou Sorrel, Calcasieu, and Port Allen locks. This resulted in a reconnaissance report specifically for the Lock that was completed in 2001 and which found justification and Federal interest in further feasibility level study of the navigation delays and potential solutions at Calcasieu Lock. |
Description: | Integrated Feasibility Study and Environmental Impact Statement |
Rights: | Approved for Public Release; Distribution is Unlimited |
URI: | https://hdl.handle.net/11681/34857 |
Size: | 152 pages / 5.479 Mb |
Types of Materials: | PDF/A |
Appears in Collections: | Environmental Documents |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Calcasieu Lock Feasibility Study with Integrated Environmental Impact Statement_2014.pdf | 5.61 MB | Adobe PDF | ![]() View/Open |