Please use this identifier to cite or link to this item: https://hdl.handle.net/11681/34653
Title: Mobile Harbor, Mobile, Alabama: Integrated General Reevaluation Report With Supplemental Environmental Impact Statement: Appendix C, Environmental
Authors: United States. Army. Corps of Engineers. Mobile District.
Keywords: Mobile Bay (Ala.)
Harbors
Environmental management
Publisher: United States. Army. Corps of Engineers. Mobile District.
Abstract: The Mobile Harbor Draft General Re-evaluation Report with Integrated Supplemental Environmental Impact Statement characterizes the affected environment of the overall Recommended Plan project area. The information in this Appendix, is incorporated by reference into the Main Draft GRR/SEIS Report. Section 2 addresses the existing conditions of the projects area of influence and the areas included in the Recommended Plan, specifically the geographic setting, biological, physical, chemical conditions, and socioeconomic conditions. Section 3 addresses the environmental consequences of the implementation of the RP as compared to the existing conditions. Section 4 provides a detailed discussion of the cumulative impacts as required under National Environmental Policy Act, as implemented by Council on Environmental Quality regulations.
Description: General Reevaluation Report and Supplemental Environmental Impact Statement
Rights: Approved for Public Release; Distribution is Unlimited
URI: https://hdl.handle.net/11681/34653
Size: 928 pages / 77.59 Mb
Types of Materials: PDF
Appears in Collections:Environmental Documents

Files in This Item:
File Description SizeFormat 
Mobile Harbor GRR with EIS_2019 Appendix C.pdf79.45 MBAdobe PDFThumbnail
View/Open