Please use this identifier to cite or link to this item:
https://hdl.handle.net/11681/34532
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Fittipaldi, J. J. | - |
dc.contributor.author | Hottman, Steven D. | - |
dc.contributor.author | Marlatt, Richard M. | - |
dc.contributor.author | Kennedy-Tucker, Inga | - |
dc.contributor.author | Bragdon, Clifford R. | - |
dc.contributor.author | Forrest, Russell | - |
dc.date.accessioned | 2019-11-06T22:07:59Z | - |
dc.date.available | 2019-11-06T22:07:59Z | - |
dc.date.issued | 1988-08 | - |
dc.identifier.govdoc | USA-CERL Technical Report N-88/19 | - |
dc.identifier.uri | https://hdl.handle.net/11681/34532 | - |
dc.description | Technical Report | en_US |
dc.description.abstract | This report provides guidance to help Army installation environmental offices perform Installation Compatible Use Zone (ICUZ) studies. The purpose of the ICUZ Program is to protect the installation mission, as well as the public, by identifying noise-impacted areas so that concerned public, local government, and installation elements can work together to minimize noise-sensitive development. The program is also designed to protect Army property from possible land encroachment that may not be compatible with the installation mission. Guidance in this report is organized to correspond with the 12 steps of the ICUZ study process. The discrete activities within each step are described in detail. Further, for quick reference, information is provided to answer the questions asked most often by those who either prepare or review ICUZ studies. | en_US |
dc.description.sponsorship | This project was conducted for Headquarters, U. S. Army Forces Command (FORSCOM), Fort McPherson, GA, under Intra-Army Order Number 25-86, dated 9 April 1985. | en_US |
dc.format.extent | 145 pages / 8.265Mb | - |
dc.format.medium | PDF/A | - |
dc.language.iso | en_US | en_US |
dc.publisher | Construction Engineering Research Laboratory (U.S.) | en_US |
dc.relation.ispartofseries | Technical Report (Construction Engineering Research Laboratory (U.S.));no. N-88/19 | - |
dc.rights | Approved for public release; distribution is unlimited | - |
dc.source | The ERDC Library created this digital resource using one or more of the following: Zeta TS-0995, Zeutcehl OS 12000, HP HD Pro 42-in. map scanner, Epson flatbed | - |
dc.subject | Noise control | en_US |
dc.subject | Environmental engineering | en_US |
dc.title | Procedures for Conducting Installation Compatible Use Zone (ICUZ) Studies | en_US |
dc.type | Report | - |
Appears in Collections: | Technical Report |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
USACERL Technical Report N-88-19.pdf | 8.46 MB | Adobe PDF | View/Open |