Please use this identifier to cite or link to this item: https://hdl.handle.net/11681/34532
Full metadata record
DC FieldValueLanguage
dc.contributor.authorFittipaldi, J. J.-
dc.contributor.authorHottman, Steven D.-
dc.contributor.authorMarlatt, Richard M.-
dc.contributor.authorKennedy-Tucker, Inga-
dc.contributor.authorBragdon, Clifford R.-
dc.contributor.authorForrest, Russell-
dc.date.accessioned2019-11-06T22:07:59Z-
dc.date.available2019-11-06T22:07:59Z-
dc.date.issued1988-08-
dc.identifier.govdocUSA-CERL Technical Report N-88/19-
dc.identifier.urihttps://hdl.handle.net/11681/34532-
dc.descriptionTechnical Reporten_US
dc.description.abstractThis report provides guidance to help Army installation environmental offices perform Installation Compatible Use Zone (ICUZ) studies. The purpose of the ICUZ Program is to protect the installation mission, as well as the public, by identifying noise-impacted areas so that concerned public, local government, and installation elements can work together to minimize noise-sensitive development. The program is also designed to protect Army property from possible land encroachment that may not be compatible with the installation mission. Guidance in this report is organized to correspond with the 12 steps of the ICUZ study process. The discrete activities within each step are described in detail. Further, for quick reference, information is provided to answer the questions asked most often by those who either prepare or review ICUZ studies.en_US
dc.description.sponsorshipThis project was conducted for Headquarters, U. S. Army Forces Command (FORSCOM), Fort McPherson, GA, under Intra-Army Order Number 25-86, dated 9 April 1985.en_US
dc.format.extent145 pages / 8.265Mb-
dc.format.mediumPDF/A-
dc.language.isoen_USen_US
dc.publisherConstruction Engineering Research Laboratory (U.S.)en_US
dc.relation.ispartofseriesTechnical Report (Construction Engineering Research Laboratory (U.S.));no. N-88/19-
dc.rightsApproved for public release; distribution is unlimited-
dc.sourceThe ERDC Library created this digital resource using one or more of the following: Zeta TS-0995, Zeutcehl OS 12000, HP HD Pro 42-in. map scanner, Epson flatbed-
dc.subjectNoise controlen_US
dc.subjectEnvironmental engineeringen_US
dc.titleProcedures for Conducting Installation Compatible Use Zone (ICUZ) Studiesen_US
dc.typeReport-
Appears in Collections:Technical Report

Files in This Item:
File Description SizeFormat 
USACERL Technical Report N-88-19.pdf8.46 MBAdobe PDFThumbnail
View/Open