Please use this identifier to cite or link to this item: https://hdl.handle.net/11681/34387
Title: Final Integrated Feasibility Report and Environmental Assessment: Pahokee Restoration Continuing Authorities Program, Section 1135 Project
Authors: United States. Army. Corps of Engineers. Jacksonville District
Keywords: Environmental protection
Restoration ecology
Okeechobee, Lake (Fla.)
Publisher: United States. Army. Corps of Engineers. Jacksonville District.
Abstract: PURPOSE: Restore historical vegetation and habitat along a portion of the southeastern Lake Okeechobee shoreline which has been degraded due to the USACE Herbert Hoover Dike project. NEED: Deep lake levels, wind, and wave activity in Lake Okeechobee near the Pahokee shoreline maintains turbid water conditions and inhibits the ability of emergent vegetation to root and establish a littoral and buffer zone. Storm events exacerbate already poor conditions.
Description: Integrated Feasibility Report and Environmental Assessment
Rights: Approved for Public Release; Distribution is Unlimited
URI: https://hdl.handle.net/11681/34387
Appears in Collections:Environmental Documents

Files in This Item:
File Description SizeFormat 
Integrated Feasibility Report and EA Pahokee Restoration_2018.pdf8.65 MBAdobe PDFThumbnail
View/Open