Please use this identifier to cite or link to this item: https://hdl.handle.net/11681/2991
Title: Planning-level cost estimates of dredged material containment islands in New York Harbor
Authors: Walski, Thomas M.
Schaefer, Thomas E.
Keywords: Containment island alternatives
Containment island cost estimates
Dredged material containment island
Dredged material
Dredging spoil
Spoil banks
New York Harbor
Dredging Operations Technical Support Program (U.S.)
Publisher: U.S. Army Engineer Waterways Experiment Station
Series/Report no.: Miscellaneous Paper (Dredging Operations Technical Support Program (U.S.)); no.Miscellaneous Paper D-88-3
Abstract: Planning-level cost estimates are presented for each of three containment island configurations to be located in Lower New York Bay. Estimates are considered to be only "order of magnitude" values based on typical unit prices for construction and operation of the assumed island configurations. Islands are limited to 500 acres including all dike boundaries. Sand dike. rock and sand dike, and sheet pile cofferdam designs are considered; cost estimates developed for each design are compared collectively.
Description: Miscellaneous Paper
Gov't Doc #: Miscellaneous Paper D-88-3
Rights: Approved for public release; distribution is unlimited
URI: http://hdl.handle.net/11681/2991
Appears in Collections:Miscellaneous Paper

Files in This Item:
File Description SizeFormat 
11583.pdfMiscellaneous Paper D-88-32.38 MBAdobe PDFThumbnail
View/Open