Please use this identifier to cite or link to this item: https://hdl.handle.net/11681/26279
Title: Final Environmental Impact Statement, Port Everglades Harbor Navigation Study, Broward County, Florida : EIS Sub-Appendix D, Natural Resource Reports : D-1, Baseline Report, 2001, D-2, Benthic and Fish, 2009
Authors: United States. Army. Corps of Engineers. Jacksonville District.
Keywords: Dredging
Inland navigation
Port Everglades (Fort Lauderdale, Fla.)
Publisher: United States. Army. Corps of Engineers. Jacksonville District.
Abstract: Dial Cordy and Associates Inc. (DC&A) was subcontracted by Gulf Engineers and Consultants, Inc. (GEC) to conduct an environmental baseline and impact assessment for proposed deepening and widening of Port Everglades, Broward County, FL for the U.S. Army Corps of Engineers, Jacksonville District, under contract No. DACW17-99-D-0043. The environmental baseline survey and impact assessment included, the collection and review of literature and existing data, field investigations to characterize marine and terrestrial habitats within the areas to be potentially impacted, a compilation of this information and an assessment of impacts associated with deepening and widening activities to the resources identified. Data was collected in an initial seagrass survey in 1999 (DC&A 1999), terrestrial surveys and additional seagrass mapping in 2000, and an outer entrance channel integrated video mapping survey in May 2001. The data collected during this study and related composite resource maps are summarized in this report.
URI: http://hdl.handle.net/11681/26279
Appears in Collections:Environmental Documents

Files in This Item:
File Description SizeFormat 
EIS_subappendix_D_Natural_resource_reports.pdf6.61 MBAdobe PDFThumbnail
View/Open