Please use this identifier to cite or link to this item: https://hdl.handle.net/11681/22869
Full metadata record
DC FieldValueLanguage
dc.contributor.authorU.S. Army Engineer Waterways Experiment Station-
dc.date.accessioned2017-08-22T22:13:13Z-
dc.date.available2017-08-22T22:13:13Z-
dc.date.issued1938-12-
dc.identifier.urihttp://hdl.handle.net/11681/22869-
dc.descriptionTechnical Memorandumen_US
dc.description.abstractIntroduction:This memorandum constitutes a report or an investigation of the foundation of Lock No. 2 of the proposed Pearl River Improvement Survey. The investigation was conducted in the Soil Mechanics Division of the U. S. Waterways Experiment Station for the Mobile Engineer District.en_US
dc.language.isoen_USen_US
dc.publisherU.S. Army Engineer Waterways Experiment Station.en_US
dc.publisherEngineer Research and Development Center (U.S.)en_US
dc.relation.ispartofseriesTechnical memorandum;131-1-
dc.rightsApproved for public release; distribution is unlimited.-
dc.sourceThis Digital Resource was created from scans of the Print Resource.-
dc.subjectFoundationsen_US
dc.subjectPearl River (Miss.)en_US
dc.titleFoundation investigation, Lock site no.2, proposed Pearl River improvementen_US
dc.typeReport-
Appears in Collections:Technical Memorandum

Files in This Item:
File Description SizeFormat 
WES Technical Memorandum No 131-1.pdf7.8 MBAdobe PDFThumbnail
View/Open