Please use this identifier to cite or link to this item:
https://hdl.handle.net/11681/22869
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | U.S. Army Engineer Waterways Experiment Station. | - |
dc.date.accessioned | 2017-08-22T22:13:13Z | - |
dc.date.available | 2017-08-22T22:13:13Z | - |
dc.date.issued | 1938-12 | - |
dc.identifier.uri | http://hdl.handle.net/11681/22869 | - |
dc.description | Technical Memorandum | en_US |
dc.description.abstract | Introduction:This memorandum constitutes a report or an investigation of the foundation of Lock No. 2 of the proposed Pearl River Improvement Survey. The investigation was conducted in the Soil Mechanics Division of the U. S. Waterways Experiment Station for the Mobile Engineer District. | en_US |
dc.language.iso | en_US | en_US |
dc.publisher | U.S. Army Engineer Waterways Experiment Station. | en_US |
dc.publisher | Engineer Research and Development Center (U.S.) | en_US |
dc.relation.ispartofseries | Technical memorandum;131-1 | - |
dc.rights | Approved for public release; distribution is unlimited. | - |
dc.source | This Digital Resource was created from scans of the Print Resource. | - |
dc.subject | Foundations | en_US |
dc.subject | Pearl River (Miss.) | en_US |
dc.title | Foundation investigation, Lock site no.2, proposed Pearl River improvement | en_US |
dc.type | Report | - |
Appears in Collections: | Technical Memorandum |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
WES Technical Memorandum No 131-1.pdf | 7.8 MB | Adobe PDF | ![]() View/Open |