Please use this identifier to cite or link to this item:
https://hdl.handle.net/11681/22869
Title: | Foundation investigation, Lock site no.2, proposed Pearl River improvement |
Authors: | U.S. Army Engineer Waterways Experiment Station. |
Keywords: | Foundations Pearl River (Miss.) |
Publisher: | U.S. Army Engineer Waterways Experiment Station. Engineer Research and Development Center (U.S.) |
Series/Report no.: | Technical memorandum;131-1 |
Abstract: | Introduction:This memorandum constitutes a report or an investigation of the foundation of Lock No. 2 of the proposed Pearl River Improvement Survey. The investigation was conducted in the Soil Mechanics Division of the U. S. Waterways Experiment Station for the Mobile Engineer District. |
Description: | Technical Memorandum |
Rights: | Approved for public release; distribution is unlimited. |
URI: | http://hdl.handle.net/11681/22869 |
Appears in Collections: | Technical Memorandum |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
WES Technical Memorandum No 131-1.pdf | 7.8 MB | Adobe PDF | ![]() View/Open |