Please use this identifier to cite or link to this item: https://hdl.handle.net/11681/22869
Title: Foundation investigation, Lock site no.2, proposed Pearl River improvement
Authors: U.S. Army Engineer Waterways Experiment Station
Keywords: Foundations
Pearl River (Miss.)
Publisher: U.S. Army Engineer Waterways Experiment Station.
Engineer Research and Development Center (U.S.)
Series/Report no.: Technical memorandum;131-1
Abstract: Introduction:This memorandum constitutes a report or an investigation of the foundation of Lock No. 2 of the proposed Pearl River Improvement Survey. The investigation was conducted in the Soil Mechanics Division of the U. S. Waterways Experiment Station for the Mobile Engineer District.
Description: Technical Memorandum
Rights: Approved for public release; distribution is unlimited.
URI: http://hdl.handle.net/11681/22869
Appears in Collections:Technical Memorandum

Files in This Item:
File Description SizeFormat 
WES Technical Memorandum No 131-1.pdf7.8 MBAdobe PDFThumbnail
View/Open