Title: Monitoring completed coastal projects-- lessons learned II
Authors: Coastal Engineering Research Center (U.S.)
Keywords: Monitoring Completed Coastal Projects (MCCP) Program
Tidal Inlets
Breakwater
Harbors
Beachfill
Beaches
Jetties
Shoals
Equilibrium
Publisher: Coastal Engineering Research Center (U.S.)
Engineer Research and Development Center (U.S.)
Series/Report no.: Coastal engineering technical note ; CETN-III-52.
Description: Technical note
General: This CETN is the second in a series summarizing lessons learned from the MCCP Program. It covers five projects for which reports have been completed: East Breakwater Rehabilitation at Cleveland Harbor, Ohio (Pope, et al., 1992); Fisherman's Wharf Breakwater, San Francisco, California (Lott, 1993); Barbers Point Harbor, Hawaii (Lillycrop, et al., 1993); Rehabilitation of the South Jetty-Ocean City, Maryland (Bass, et al., 1993); and Beach Erosion Control Project at Oakland Beach, Rhode Island (LeBlanc and Bottin, 1992). These projects covered four general areas: breakwaters; a jettied inlet; harbors; and a beachfill.
Rights: Approved for public release; distribution is unlimited.
URI: http://hdl.handle.net/11681/2211
Appears in Collections:Technical Note - Section III Coastal Structures

Files in This Item:
File Description SizeFormat 
CETN-III-52.pdf386.99 kBAdobe PDFThumbnail
View/Open