Please use this identifier to cite or link to this item: https://hdl.handle.net/11681/21427
Full metadata record
DC FieldValueLanguage
dc.contributorUnited States. Mississippi River Commission.-
dc.contributor.authorU.S. Army Engineer Waterways Experiment Station.-
dc.date.accessioned2017-02-15T14:35:56Z-
dc.date.available2017-02-15T14:35:56Z-
dc.date.issued1943-09-
dc.identifier.urihttp://hdl.handle.net/11681/21427-
dc.descriptionTechnical memorandum-
dc.descriptionSynopsis: This memorandum constitutes a comprehensive report on the Absecon Inlet model study, which was conducted by the U.S. Waterways Experiment Station for the Philadelphia Engineer District during the period March 1939 to April a942. The model study was authorized by the Chief of Engineers, U. S. Army, on 14 February 1939.-
dc.publisherU.S. Army Engineer Waterways Experiment Station.-
dc.publisherEngineer Research and Development Center (U.S.)-
dc.relationhttp://acwc.sdp.sirsi.net/client/en_US/search/asset/1051208-
dc.rightsApproved for public release; distribution is unlimited.-
dc.sourceThis Digital Resource was created from scans of the Print Resource.-
dc.subjectLittoral drift-
dc.subjectJetties-
dc.subjectHydraulic models-
dc.titleModel study of plans for elimination of shoaling in Absecon Inlet, New Jersey-
dc.typeReporten_US
Appears in Collections:Technical Memorandum

Files in This Item:
File Description SizeFormat 
WES-Technical-Memorandum-No.204-1.pdf16.68 MBAdobe PDFThumbnail
View/Open