Please use this identifier to cite or link to this item:
https://hdl.handle.net/11681/21238
Title: | Model study of hydraulic characteristics of power tunnel, Fort Peck Dam |
Authors: | U.S. Army Engineer Waterways Experiment Station. |
Keywords: | Water tunnels Hydroelectric power plants Hydraulic models Fort Peck Dam (Mont.) |
Publisher: | U.S. Army Engineer Waterways Experiment Station. Engineer Research and Development Center (U.S.) |
Description: | Technical memorandum General Remarks: This memorandum is the final report of a study performed at the U. S. Waterways Experiment Station on a model of Tunnel No. 1, Fort Peck Dam. The study was concerned with hydraulic problems encountered in the design of a 3-unit hydroelectric plant to be located at the existing tunnel outlet. The model upon which these problems were investigated was built to the undistorted linear scale of 1 to 20 and included, in addition to the entire length of tunnel, all such components as the intakes, control shafts, transitions, penstocks, and surge tanks. |
Rights: | Approved for public release; distribution is unlimited. |
URI: | http://hdl.handle.net/11681/21238 |
Appears in Collections: | Technical Memorandum |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
WES-Technical-Memorandum-No.185-1.pdf | 24.16 MB | Adobe PDF | ![]() View/Open |