Please use this identifier to cite or link to this item:
https://hdl.handle.net/11681/21235
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor | United States. Mississippi River Commission | - |
dc.contributor.author | U.S. Army Engineer Waterways Experiment Station | - |
dc.date.accessioned | 2017-02-15T14:34:45Z | - |
dc.date.available | 2017-02-15T14:34:45Z | - |
dc.date.issued | 1946-03 | - |
dc.identifier.uri | http://hdl.handle.net/11681/21235 | - |
dc.description | Technical memorandum | - |
dc.description | Purpose: The purpose of this test was to determine the effectiveness of PBS-lined (double thickness) side ditches in the prevention of capillary saturation of the subgrade when the side ditches remain filled with water. | - |
dc.publisher | U.S. Army Engineer Waterways Experiment Station. | - |
dc.publisher | Engineer Research and Development Center (U.S.) | - |
dc.relation | http://acwc.sdp.sirsi.net/client/en_US/search/asset/1051068 | - |
dc.rights | Approved for public release; distribution is unlimited. | - |
dc.source | This Digital Resource was created from scans of the Print Resource. | - |
dc.subject | Coated fabrics | - |
dc.subject | Waterproofing | - |
dc.subject | Bituminous materials | - |
dc.title | Subgrade moisture protection with prefabricated bituminous surfacing | - |
dc.type | Report | en_US |
Appears in Collections: | Technical Memorandum |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
WES-Technical-Memorandum-No.211-5A.pdf | 850.85 kB | Adobe PDF | View/Open |