Please use this identifier to cite or link to this item:
https://hdl.handle.net/11681/20941
Title: | Evaluation of vertical sand drains for St. Charles Parish Lakefront Levee, Lake Pontchartrain, New Orleans, La. |
Authors: | United States. Army. Corps of Engineers. Lower Mississippi Valley Division. United States. Army. Corps of Engineers. New Orleans District. McAnear, Clifford L. |
Keywords: | St. Charles Parish Lakefront Levee Lake Pontchartrain New Orleans Louisiana Levees Levee foundations Soil stabilization Sand drains Vertical sand drains Design Borings |
Publisher: | Soils and Pavements Laboratory (U.S.) Engineer Research and Development Center (U.S.) |
Description: | Miscellaneous Paper Abstract: The evaluation described in this report was initiated to determine the feasibility of using sand drains to stabilize the foundation of the St. Charles Parish Lakefront Levee. The study was terminated after preliminary evaluations indicated that sand drains were not economically justified for the site. This report contains the results of field and laboratory tests; estimated costs for a test section that was to have been used to evaluated different methods of sand drain placement and different sand drain sizes and spacings; and estimated costs of sand drains if used for the levee construction. NOTE: This file is large. Allow your browser several minutes to download the file. |
Rights: | Approved for public release; distribution is unlimited. |
URI: | http://hdl.handle.net/11681/20941 |
Appears in Collections: | Miscellaneous Paper |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
MP-S-75-8.pdf | 28.75 MB | Adobe PDF | ![]() View/Open |