Please use this identifier to cite or link to this item: https://hdl.handle.net/11681/20269
Full metadata record
DC FieldValueLanguage
dc.contributor.authorAl-Chaar, Ghassan K.-
dc.contributor.authorCalfas, George W.-
dc.contributor.authorWeiss, Michael A.-
dc.contributor.authorValentino, Michael K.-
dc.contributor.authorGuertin, Patrick J. (Patrick James)-
dc.date.accessioned2016-10-28T21:07:37Z-
dc.date.available2016-10-28T21:07:37Z-
dc.date.issued2016-
dc.identifier.urihttp://hdl.handle.net/11681/20269-
dc.descriptionAt head of title: "FY16 T45 Contingency Base Site Evaluations for Tactical Environment."-
dc.description.abstractAbstract: To sustain itself as the world's premier land power, the Army needs the capability to support expeditionary forces by projecting a minimal basing footprint with reduced logistical burdens. Strategically sited Contingency Bases (CBs) allow the Army’s expeditionary forces to rapidly respond and attack the enemy throughout the joint area of operations (JOA). Strategic conditions will be analyzed through the lens of eight OE variables—political, military, economic, social, information, infrastructure, physical environment, and time (PMESII-PT). The Army has neither a well-grounded methodology nor the tools that enable this strategic decision-making capability. Decision makers require reliable information about the situational dynamics of the operational environment to anticipate the impacts that siting and operating CBs will have on the local context, and to consider the effects of the sites on the operation of CBs. This capability to anticipate CB impacts and resources draws upon knowledge gleaned from the local population and becomes particularly important for engagement operations when CBs will have a longer duration of use and interaction with the local populace. This report considers access of building materials required for the construction of CBs and develops a methodology for strategically siting CBs that can be replicated in other locations throughout the world. This work then validates the developed methodology with a case study of Dhaka, Bangladesh.-
dc.publisherUnited States. Army. Corps of Engineers.-
dc.publisherEngineer Research and Development Center (U.S.)-
dc.publisherConstruction Engineering Research Laboratory.-
dc.publisherContingency Base Site Evaluations for Tactical Environment Program (U.S.)-
dc.relationhttp://acwc.sdp.sirsi.net/client/search/asset/1051267-
dc.relation.ispartofseriesERDC/CERL ; TR-16-14-
dc.subjectLogistics-
dc.subjectMilitary bases--Bangladesh--Dhaka-
dc.titleConstruction material-based methodology for military contingency base construction : case study of Dhaka, Bangladesh-
Appears in Collections:Technical Report

Files in This Item:
File Description SizeFormat 
ERDC-CERL TR-16-14.pdf14.2 MBAdobe PDFThumbnail
View/Open