Please use this identifier to cite or link to this item:
https://hdl.handle.net/11681/2018
Title: | Boston Harbor dredged material capping simulation |
Authors: | Lee, Landris T. |
Keywords: | Aquatic cells Boston Harbor Capping Sediment Sediment Cap Soil Water |
Publisher: | Coastal and Hydraulics Laboratory (U.S.) Engineer Research and Development Center (U.S.) |
Series/Report no.: | Technical note (Coastal and Hydraulics Engineering (U.S.)) ; VI-36. |
Description: | Technical note PURPOSE: This Coastal and Hydraulics Engineering Technical Note (CHETN) documents geotechnical research performed by the U.S. Army Engineer Research and Development Center (ERDC) specifically for the Boston Harbor Navigation Improvement Project. Laboratory modeling of the subaqueous sand capping process was conducted to allow a comparison to field performance of sand capping dredged material in a confined aquatic disposal cell. |
Rights: | Approved for public release; distribution is unlimited. |
URI: | http://hdl.handle.net/11681/2018 |
Appears in Collections: | Technical Note |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
CHETN-VI-36.pdf | 573.95 kB | Adobe PDF | ![]() View/Open |