Please use this identifier to cite or link to this item: https://hdl.handle.net/11681/2018
Title: Boston Harbor dredged material capping simulation
Authors: Lee, Landris T.
Keywords: Aquatic cells
Boston Harbor
Capping
Sediment
Sediment Cap
Soil
Water
Publisher: Coastal and Hydraulics Laboratory (U.S.)
Engineer Research and Development Center (U.S.)
Series/Report no.: Technical note (Coastal and Hydraulics Engineering (U.S.)) ; VI-36.
Description: Technical note
PURPOSE: This Coastal and Hydraulics Engineering Technical Note (CHETN) documents geotechnical research performed by the U.S. Army Engineer Research and Development Center (ERDC) specifically for the Boston Harbor Navigation Improvement Project. Laboratory modeling of the subaqueous sand capping process was conducted to allow a comparison to field performance of sand capping dredged material in a confined aquatic disposal cell.
Rights: Approved for public release; distribution is unlimited.
URI: http://hdl.handle.net/11681/2018
Appears in Collections:Technical Note

Files in This Item:
File Description SizeFormat 
CHETN-VI-36.pdf573.95 kBAdobe PDFThumbnail
View/Open