Please use this identifier to cite or link to this item: https://hdl.handle.net/11681/1812
Title: Jackson Hole flood control project
Authors: United States. Army. Corps of Engineers. Committee on Channel Stabilization
Keywords: Banks
Channels
Erosion
Gravel bars
Gros Ventre River
Jackson, Wyoming
Landslides
Snake River
Streambed gravels
Tributary streams
Publisher: United States. Army. Corps of Engineers. Committee on Channel Stabilization
Engineer Research and Development Center (U.S.)
Description: Technical report
INTRODUCTION: At the 28th meeting of the Committee on Channel Stabilization, held in Vicksburg, Mississippi, on 22-23 May 1973, a representative of the U. S. Army Engineer District, Walla Walla, described the Jackson Hole Flood Control Project on the Snake River in Wyoming and requested the advice of the Committee on certain aspects of the project. At its 29th meeting, held in Jackson, Wyoming, on 18-19 September 1973, the Committee inspected and further discussed various aspects of the project. Specific questions that were submitted in writing by the District representative at the May meeting are repeated hereinafter, followed in each case by the respective response of the Committee as initially prepared after the May meeting and modified after the September inspection and meeting. To clearly identify the project which this report applies, the authorized project description extracted from the reports supplied by the District is summarized very briefly below. Committee recommendations are presented at the end of the report.
URI: http://hdl.handle.net/11681/1812
Appears in Collections:Committee on Channel Stabilization

Files in This Item:
File Description SizeFormat 
TR-11-1974.pdf2.14 MBAdobe PDFThumbnail
View/Open