Search


Current filters:

Start a new search
Add filters:

Use filters to refine the search results, then click the above search button.


Results 1-10 of 73 (Search time: 0.026 seconds).
Item hits:
Issue DateTitleAuthor(s)
2018-06San Juan Harbor, Puerto Rico : Integrated Feasibility Report and Environmental Assessment : Appendix B, Dredged Material Management Plan Preliminary AssessmentUnited States. Army. Corps of Engineers. Jacksonville District.
2018-06Benthic Community Reconnaissance Survey: Port Everglades Navigation Improvements Project: Final ReportDial Cordy and Associates.
2021-01Environmental Assessment and Finding of No Significant Impact : Maintenance Dredging of the McGriff Channel at Suwannee River : Dixie County, FloridaUnited States. Army. Corps of Engineers. Jacksonville District.
2019-08Environmental Assessment: Operation and Maintenance Dredging and Dredged Material Placement for the South Channel Extension of the Manatee Harbor Florida Navigation Project at Port Manatee, FloridaUnited States. Army. Corps of Engineers. Jacksonville District.
2017-04Miami Harbor Phase III, Federal Channel Expansion Project, Permit No. 0305721-001-BI : One-Year Post-Construction Impact Assessment for Hardbottom Middle and Outer Reef Benthic Communities at Permanent SitesUnited States. Army. Corps of Engineers. Jacksonville District.
2015-05Final Environmental Impact Statement, Port Everglades Harbor Navigation Study, Broward County, Florida : EIS Sub-Appendix D, Natural Resource Reports : D-1, Baseline Report, 2001, D-2, Benthic and Fish, 2009United States. Army. Corps of Engineers. Jacksonville District.
2016-01Environmental Assessment : Placement of Intracoastal Waterway and Okeechobee Waterway Dredged Material in the St. Lucie Inlet Sediment Impoundment Basin, Martin County, FloridaUnited States. Army. Corps of Engineers. Jacksonville District.
2017-11Miami Harbor Phase III, Federal Channel Expansion Project, Permit No. 0305721-001-BI : Impact Assessment for Hardbottom Middle and Outer Reef Benthic Communities at Cross Sites : Appendix A, DCA 2012 Site Number Cross Walk ReferenceUnited States. Army. Corps of Engineers. Jacksonville District.
2017-04Miami Harbor Phase III, Federal Channel Expansion Project, Permit No. 0305721-001-BI : One-Year Post-Construction Impact Assessment for Hardbottom Middle and Outer Reef Benthic Communities at Permanent Sites : Appendix B, Statistical AnalysisUnited States. Army. Corps of Engineers. Jacksonville District.
2015-05Final Environmental Impact Statement, Port Everglades Harbor Navigation Study, Broward County, Florida : EIS Sub-Appendix E, Mitigation and Monitoring PlanUnited States. Army. Corps of Engineers. Jacksonville District.