Search


Current filters:

Start a new search
Add filters:

Use filters to refine the search results, then click the above search button.


Results 1-6 of 6 (Search time: 0.456 seconds).
  • previous
  • 1
  • next
Item hits:
Issue DateTitleAuthor(s)
2000-09Inflow zone and discharge through propeller jetsMaynord, Stephen T.
1995-09Upper Mississippi River System Environmental Management Program Definite Project Report (R-11F) with Integrated Environmental Assessment : Banner Marsh State Fish and Wildlife Area, LaGrange Pool, Illinois Waterway, River Miles 138.5-143.9, Fulton and Peoria Counties, IllinoisUnited States. Army. Corps of Engineers. Rock Island District
1990-07Upper Mississippi River System Environmental Management Program Definite Project Report (R-6F) with Integrated Environmental Assessment : Peoria Lake Enhancement, Peoria Pool, Illinois WaterwayUnited States. Army. Corps of Engineers. Rock Island District
1991-06Upper Mississippi River System Environmental Management Program Definite Project Report (R-7F) with Integrated Environmental Assessment : Lake Chautauqua Rehabilitation and Enhancement, LaGrange Pool, Illinois Waterway, Mason County, IllinoisUnited States. Army. Corps of Engineers. Rock Island District
2003-09Environmental objectives planning workshopsUnited States. Army. Corps of Engineers. Rock Island District; United States. Army. Corps of Engineers. St. Louis District; United States. Army. Corps of Engineers. St. Paul District; Upper Mississippi River-Illinois Waterway System Navigation Study; Theiling, Charles H.; Soileau, Rebecca Seal
2011-03Upper Mississippi River System Environmental Management Program Definite Project Report with Integrated Environmental Assessment (R-17F) : Rice Lake State Fish and Wildlife Area Habitat Rehabilitation and Enhancement Project, LaGrange Pool, Illinois Waterway, River Miles 132.0 Through 138.0, Fulton County, IllinoisUnited States. Army. Corps of Engineers. Rock Island District