Search


Current filters:

Start a new search
Add filters:

Use filters to refine the search results, then click the above search button.


Results 1-10 of 25 (Search time: 0.242 seconds).
Item hits:
Issue DateTitleAuthor(s)
2005-12Baltimore Harbor and Channels (MD and VA) Dredged Material Management Plan and Final Tiered Environmental Impact Statement : Volume I - TextWeston Solutions; Inc.
2005-12Baltimore Harbor and Channels (MD and VA) Dredged Material Management Plan and Final Tiered Environmental Impact Statement : Volume II - AppendicesWeston Solutions; Inc.
1986-04Engineering Study for Disposal of Dredged Material from Atlantic Ocean Channel on Sandbridge Beach between Back Bay and Dam NeckWaterway Survey & Engineering, Ltd.
2015-12Final Programmatic Environmental Impact Statement for Dredged Material Management Plan : Long Island Sound, Connecticut, New York and Rhode IslandBattelle Memorial Institute
2009-06Final Summary Report, Plume Monitoring : Boston Harbor Inner Harbor Maintenance Dredging ProjectBattelle Memorial Institute
2009-04Final Mid-Chesapeake Bay Island Ecosystem Restoration Integrated Feasibility Report and Environmental Impact Statement (EIS) : Volume 2 of 3 (Appendices A, B and D-N)United States. Army. Corps of Engineers. Baltimore District
2022-09Finding of No Significant Impact and Environmental Assessment : Maintenance Dredged, Wicomico River, Federal Navigation Project, Wicomico and Somerset Counties, MarylandUnited States. Army. Corps of Engineers. Baltimore District
2009-04Final Mid-Chesapeake Bay Island Ecosystem Restoration Integrated Feasibility Report and Environmental Impact Statement (EIS) : Volume 3a of 3 (Appendix C, Part One)United States. Army. Corps of Engineers. Baltimore District
2019-12Final Environmental Assessment : Wolf Trap Alternate Open Water Placement Site Northern Extension, Virginia Waters of the Chesapeake BayUnited States. Army. Corps of Engineers. Baltimore District
2009-04Final Mid-Chesapeake Bay Island Ecosystem Restoration Integrated Feasibility Report and Environmental Impact Statement (EIS) : Volume 3b of 3 (Appendix C, Part Two)United States. Army. Corps of Engineers. Baltimore District