Skip navigation
Toggle navigation
Home
Browse
Communities
& Collections
Browse Items by:
Issue Date
Author
Title
Subject
Type
Report
About
About Knowledge Core
Policies
History of ERDC
Contact Us
Help
Help
FAQ
Sign on to:
My Knowledge Core
Edit Profile
ERDC Knowledge Core
Browsing "Portland District" by Title
Jump to:
0-9
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
or enter first few letters:
Sort by:
title
issue date
submit date
In order:
Ascending
Descending
Results/Page
5
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
90
95
100
Authors/Record:
All
1
5
10
15
20
25
30
35
40
45
50
Showing results 19 to 36 of 36
< previous
Issue Date
Title
Author(s)
2019-04
Lower Columbia and Willamette Rivers Elevation Datum Summary
Bondurant, Clifford L.
2022-02
Lower Columbia River Basin Peak Stage-Frequency Report : Final Report
United States. Army. Corps of Engineers. Portland District
1973-12
Modification of Fish Ladders Bonneville Dam, Columbia River Oregon and Washington : Hydraulic Model Investigation
Perkins, Louis Z.
;
Smith, Peter M.
2007-07
Mount St. Helens Ecosystem Restoration General Reevaluation Study Reconnaissance Report
United States. Army. Corps of Engineers. Portland District
2018-08
Mount St. Helens Long-Term Sediment Management Plan : Final Supplemental Environmental Impact Statement
United States. Army. Corps of Engineers. Portland District
1984-12
Mount St. Helens, Washington Feasibility Report & Environmental Impact Statement : Toutle, Cowlitz, and Columbia Rivers : Volume 1, Main Report
United States. Army. Corps of Engineers. Portland District
1984-12
Mount St. Helens, Washington Feasibility Report & Environmental Impact Statement : Toutle, Cowlitz, and Columbia Rivers : Volume 2, Appendixes
United States. Army. Corps of Engineers. Portland District
1984-09
Navigation channel improvement, Columbia River, Oregon and Washington, Longview to Kalama Reach, River Miles 64 to 78 : Hydraulic Model Investigation
United States. Army. Corps of Engineers. North Pacific Division. Hydraulic Laboratory
1979-10
Outlet Works for Lost Creek Dam, Rogue River, Oregon : Hydraulic Model Investigations
United States. Army. Corps of Engineers. North Pacific Division. Hydraulic Laboratory
2018-04
Port Orford Operations and Maintenance Dredging and Dredged Material Placement : Nearshore Placement Site Expansion
United States. Army. Corps of Engineers. Portland District
1993-05
Project Improvements for Endangered Species (PIES) - Project Management Plan
United States. Army. Corps of Engineers. Portland District
1981-09
Recommendations for turbine generator loadings and blade gate relationships for the best survival of juvenile migrants at the eight Columbia basin dams operated by the Corp of Engineers
Bell, Milo C.
2012-06
Revised Final Environmental Assessment : Columbia River at the Mouth, Oregon and Washington : Rehabilitation of the Jetty System at the Mouth of the Columbia River
United States. Army. Corps of Engineers. Portland District
2022-08
Sand Island Pile Dike System Repairs, Columbia River : Final Environmental Assessment
United States. Army. Corps of Engineers. Portland District
2010-05
Toutle/Cowlitz River Sediment Budget
Biedenharn Group, LLC.
2004-02
Turbine Survival Program (TSP) : phase 1 report : 1997-2003
Hydroelectric Design Center (U.S.)
;
United States. Army. Corps of Engineers. Portland District
;
United States. Army. Corps of Engineers. Walla Walla District
2021-01
Water Temperature Trends in the Columbia River Basin
O'Connor, Ben L.
2019-12
Willamette Basin Review Feasibility Study : Final Integrated Feasibility Report and Environmental Assessment
United States. Army. Corps of Engineers. Portland District