Search


Current filters:


Start a new search
Add filters:

Use filters to refine the search results, then click the above search button.


Results 1-10 of 191 (Search time: 0.102 seconds).
Item hits:
Issue DateTitleAuthor(s)
2005-12Baltimore Harbor and Channels (MD and VA) Dredged Material Management Plan and Final Tiered Environmental Impact Statement : Volume I - TextWeston Solutions; Inc.
1965-06Symposium on channel stabilization problemsUnited States. Army. Corps of Engineers. Committee on Channel Stabilization
2013-04Florida Inland Navigation District Dredged Material Management Area IR-2 Mitigation Area, Indian River County, Florida : Baseline Mitigation Monitoring ReportHobe Sound Environmental Consultants, Inc.
2005-12Baltimore Harbor and Channels (MD and VA) Dredged Material Management Plan and Final Tiered Environmental Impact Statement : Volume II - AppendicesWeston Solutions; Inc.
1998-01Lower Monongahela River Project, Locks and Dams 2, 3, and 4 : Disposal of Dredged and Excavated Material : Final Supplemental Environmental Impact StatementUnited States. Army. Corps of Engineers. Pittsburgh District.
2021-06Lower Granite Reservoir Biological Monitoring at 2015 Disposal Site : 2018–2020 Final Report of ResearchHemingway, Rulon J.; Tiffan, Kenneth F.
1986-04Engineering Study for Disposal of Dredged Material from Atlantic Ocean Channel on Sandbridge Beach between Back Bay and Dam NeckWaterway Survey & Engineering, Ltd.
2017-09Section 203 Final Integrated Feasibility Report and Environmental Impact Statement for the Houma Navigation Canal Deepening Project, Terrebonne Parish, LouisianaGEC Inc.
2009-08Gulfport Harbor Navigation Channel: Final Supplemental EISCH2M HILL (Firm)
2019-06FY18 Two Rivers Harbor Sediment Sampling and Analysis, Two Rivers, WisconsinAdvanced Environmental Management Group