Please use this identifier to cite or link to this item: https://hdl.handle.net/11681/13674
Title: Prototype filling and emptying system measurements, New Bankhead Lock, Black Warrior River, Alabama
Authors: United States. Army. Corps of Engineers. Mobile District
Tool, Allen R.
Keywords: Hydraulic models
John Hollis Bankhead Lock and Dam
Black Warrior River
Alabama
Locks
Lock filling and emptying system
Hydraulic structures
Prototypes
Prototype tests
Water pressure measurement
Publisher: Hydraulics Laboratory (U.S.)
Engineer Research and Development Center (U.S.)
Series/Report no.: Technical report (U.S. Army Engineer Waterways Experiment Station) ; HL-80-13.
Description: Technical Report
Abstract: Prototype studies were conducted to measure pressures in the filling and emptying culvert system and to monitor various other parameters relating to the operation of the new John Hollis Bankhead Lock. Air demand downstream of the filling valve was studied as related to low pressures in the culvert. Measurements at some points in the culverts indicate that pressures existed at or near the vapor pressure of water for certain test conditions. Prototype data are compared with math model computations for piezometric head downstream of the filling valve , valve well water-surface elevation, and lock water-surface elevation. This comparison revealed generally good agreement.
Rights: Approved for public release; distribution is unlimited.
URI: http://hdl.handle.net/11681/13674
Appears in Collections:Technical Report

Files in This Item:
File Description SizeFormat 
TR-HL-80-13.pdf6.6 MBAdobe PDFThumbnail
View/Open