Please use this identifier to cite or link to this item: https://hdl.handle.net/11681/12799
Title: Foundation grouting practices at Corps of Engineers dams
Authors: United States. Army. Corps of Engineers. Missouri River Division.
United States. Army. Corps of Engineers. Southwestern Division.
George Washington University.
Albritton, John A.
Jackson, Lawson.
Bangert, Robert.
Keywords: Grouting
Foundations
Construction management
Hydraulic structures
Dams
Grouting contracts
Grouting costs
Grouting procedures
Case histories
Publisher: Geotechnical Laboratory (U.S.)
Engineer Research and Development Center (U.S.)
Series/Report no.: Technical report (U.S. Army Engineer Waterways Experiment Station) ; GL-84-13.
Description: Technical Report
Abstract: This report includes results of review of 23 grouting case histories at 14 Corps of Engineers projects constructed over a 4-decade period. Corps grouting practices, including technical requirements, contractual procedures, and construction management of grouting work are analyzed. Results of the grouting projects are evaluated and costs are analyzed along with legal decisions and trends. The report identifies areas of needed improvements in the Corps grouting programs and makes specific recommendations for achieving those improvements. Note: This file is large. Allow your browser several minutes to download the file.
Rights: Approved for public release; distribution is unlimited.
URI: http://hdl.handle.net/11681/12799
Appears in Collections:Technical Report

Files in This Item:
File Description SizeFormat 
TR-GL-84-13.pdf52.55 MBAdobe PDFThumbnail
View/Open