Please use this identifier to cite or link to this item: https://hdl.handle.net/11681/12070
Title: Winter bridging exercise on thick ice: Fort McCoy, Wisconsin, 1988
Authors: United States. Army. Office of the Chief of Engineers
Coutermarsh, Barry A.
Keywords: Army winter bridging
Ice cutting
Ribbon Bridge
Winter warfare
Publisher: Cold Regions Research and Engineering Laboratory (U.S.)
Engineer Research and Development Center (U.S.)
Series/Report no.: Special report (Cold Regions Research and Engineering Laboratory (U.S.)) ; 90-10.
Description: Special Report
Abstract: Deployment alternatives for the U.S. Army Ribbon Bridge on a waterway covered with 24-in.-thick ice were investigated. Ice clearing methods using a bulldozer, ice tongs, chain saws and the hoists available on the bridge transporter trucks all worked with varying degrees of success. Sections of the Ribbon Bridge were deployed directly on the ice cover, a procedure that has potential but that also has problems and unanswered questions.
Rights: Approved for Public Release, Distribution is Unlimited
URI: http://hdl.handle.net/11681/12070
Appears in Collections:Special Report

Files in This Item:
File Description SizeFormat 
SR-90-10.pdf5.3 MBAdobe PDFThumbnail
View/Open