Please use this identifier to cite or link to this item:
https://hdl.handle.net/11681/11612
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Affleck, Rosa T. | - |
dc.contributor.author | Carr, Meredith L. | - |
dc.date.accessioned | 2016-06-20T14:21:11Z | - |
dc.date.available | 2016-06-20T14:21:11Z | - |
dc.date.issued | 2014-12 | - |
dc.identifier.govdoc | ERDC/CRREL SR-14-3 | - |
dc.identifier.uri | http://hdl.handle.net/11681/11612 | - |
dc.description | Special Report | - |
dc.description.abstract | During the austral summer, the snowmelt runoff at McMurdo Station is quite unique and variable. As the temperature gradually warms up, McMurdo staff clears winter snow and ice accumulation in the drainage channels to accommodate the incoming snowmelt runoff. This ephemeral flow is observed as diurnal daily fluctuation throughout the austral season and varies depending on the air temperature and many other factors. In addition, the runoff mobilizes sediment that is washed into these channels and transports contaminants into to Winter Quarters Bay and McMurdo Sound. The overall goal of this document is to provide guidance for operation and maintenance of in-town roads and the drainage system. The processes and steps referred to in this document require further verification to incorporate lessons learned and to promote appropriate best practices. | - |
dc.description.sponsorship | Engineering for Polar Operations, Logistics and Research Program (U.S.) | - |
dc.description.sponsorship | National Science Foundation (U.S.). Division of Polar Programs. | - |
dc.format.extent | 51 pages/2.309 Mb | - |
dc.publisher | Cold Regions Research and Engineering Laboratory (U.S.) | - |
dc.publisher | Engineer Research and Development Center (U.S.) | - |
dc.relation | http://acwc.sdp.sirsi.net/client/en_US/search/asset/1040864 | - |
dc.relation.ispartofseries | ERDC/CRREL ; SR-14-3 | - |
dc.rights | Approved for Public Release; Distribution is Unlimited | - |
dc.source | This Digital Resource was created in Microsoft Word and Adobe Acrobat | - |
dc.subject | Drainage | - |
dc.subject | EPOLAR | - |
dc.subject | Erosion | - |
dc.subject | Runoff | - |
dc.subject | Sediment ponds | - |
dc.subject | Slope stability | - |
dc.subject | Snowmelt | - |
dc.subject | Weirs | - |
dc.subject | McMurdo Station | - |
dc.subject | Antarctica | - |
dc.title | Preliminary guidelines and standard operating procedure for drainage and erosion control at McMurdo Station | - |
dc.type | Report | - |
Appears in Collections: | Special Report |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
ERDC-CRREL-SR-14-3.pdf | 2.36 MB | Adobe PDF | ![]() View/Open |