Please use this identifier to cite or link to this item:
https://hdl.handle.net/11681/11465
Title: | Bamboo reinforced concrete |
Authors: | United States. Army. Office of the Chief of Engineers. Geymayer, H. G. Cox, F. B. (Frank B.) |
Keywords: | Reinforced concrete Bamboo Cracking |
Publisher: | Concrete Laboratory (U.S.) Engineer Research and Development Center (U.S.) |
Series/Report no.: | Miscellaneous paper (U.S. Army Engineer Waterways Experiment Station) ; C-70-2. |
Description: | Miscellaneous paper Foreword: The investigation on which this paper is based was sponsored by the Office, Chief of Engineers (RDT&E), and reported in the Waterways Experiment Station Technical Report No. C-69-3, February 1969. This paper was prepared at the request of Mr. Robert E. Wilde, Assistant Secretary, American Concrete Institute, for publication in the Journal of the American Concrete Institute. The paper has been reviewed and approved for publication by the Office, Chief of Engineers. Preparation of the paper was accomplished at the Concrete Division, U. S. Army Engineer Waterways Experiment Station, under the direction of Mr. Bryant Mather, Chief, Concrete Division. Colonel Levi A. Brown, CE, was Director of the Waterways Experiment Station during the preparation of this paper and Mr. F. R. Brown was Technical Director. |
Rights: | Approved for public release; distribution is unlimited. |
URI: | http://hdl.handle.net/11681/11465 |
Appears in Collections: | Miscellaneous Paper |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
MP-C-70-2.pdf | 1.4 MB | Adobe PDF | ![]() View/Open |