Please use this identifier to cite or link to this item: https://hdl.handle.net/11681/10030
Full metadata record
DC FieldValueLanguage
dc.contributor.authorTeeter, Allen M.-
dc.date.accessioned2016-06-20T13:50:12Z-
dc.date.available2016-06-20T13:50:12Z-
dc.date.issued1988-12-
dc.identifier.urihttp://hdl.handle.net/11681/10030-
dc.descriptionTechnical report-
dc.publisherUS Army Engineer, Waterways Experiment Station. Environmental Laboratory-
dc.publisherEngineer Research and Development Center (U.S.)-
dc.relationhttp://acwc.sdp.sirsi.net/client/en_US/search/asset/1002884-
dc.relation.ispartofseriesTechnical report (U.S. Army Engineer Waterways Experiment Station) ; EL-88-15 rept. 2.-
dc.rightsApproved for public release; distribution is unlimited.-
dc.titleNew Bedford Harbor Superfund Project, Acushnet River Estuary engineering feasibility study of dredging and dredged material disposal alternatives. Report 2, Sediment and contaminant hydraulic transport investigations-
dc.typeReporten_US
Appears in Collections:Technical Report

Files in This Item:
File Description SizeFormat 
TR EL-88-15 Report 2.pdf12.12 MBAdobe PDFThumbnail
View/Open