Please use this identifier to cite or link to this item: https://hdl.handle.net/11681/10021
Title: New Bedford Harbor Superfund Project, Acushnet River Estuary engineering feasibility study of dredging and dredged material disposal alternatives. Report 10, Evaluation of dredging and dredging control technologies
Authors: Palermo, Michael R.
Pankow, Virginia R.
Publisher: US Army Corps of Engineers, Waterways Experiment Station
Engineer Research and Development Center (U.S.)
Series/Report no.: Technical report (U.S. Army Engineer Waterways Experiment Station) ; EL-88-15 rept. 10.
Description: Technical report
URI: http://hdl.handle.net/11681/10021
Appears in Collections:Technical Report

Files in This Item:
File Description SizeFormat 
TR-EL-88-15-10.pdf5.79 MBAdobe PDFThumbnail
View/Open