Please use this identifier to cite or link to this item:
https://hdl.handle.net/11681/10016
Title: | New Bedford Harbor Superfund Project, Acushnet River Estuary engineering feasibility study of dredging and dredged material disposal alternatives. Report 7, Settling and chemical clarification tests |
Authors: | Wade, Roy |
Publisher: | US Army Corps of Engineers, Waterways Experiment Station. Environmental Laboratory |
Series/Report no.: | Technical report (U.S. Army Engineer Waterways Experiment Station) ; EL-88-15 rept. 7. |
Description: | Technical report |
URI: | http://hdl.handle.net/11681/10016 |
Appears in Collections: | Technical Report |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
TR EL-88-15 Report 7.pdf | 5.6 MB | Adobe PDF | ![]() View/Open |